Access keys | Skip to content | Skip to footer |
Problems viewing this site

How much does it cost to register plant?

The same fees apply to an original application for registration or a renewal of registration plant, if the plant is registered for the full twelve months. Otherwise a pro rata fee will apply.

The following table extracted from Schedule 1 of the Workplace Health and Safety Regulation 2008 sets out the fee for registration or renewal of registration of registrable plant.

Type of plant

Fee amount

Boiler with a heating surface of (this is subject to subsection (3))

(i) not more than 5 m2

59.75

(ii) more than 5 m2 but 10 m2 or less

143.10

(iii) more than 10 m2 but 60 m2 or less

224.75

(iv) more than 60 m2 but 500 m2 or less

430.60

(v) more than 500 m2 but 2 000 m2 or less

761.90

(vi) more than 2 000 m2

1286.70

Unfired pressure vessel with a capacity of:

(i) more than 0.5 m3 but 5 m3 or less

64.70

(ii) more than 5 m3 but 15 m3 or less

110.60

(iii) more than 15 m3 but 30 m3 or less

166.60

(iv) more than 30 m3

219.15

Crane or hoist (other than vehicle hoists, building maintenance units or elevating work platforms) with a safe working load of:

(i) not more than 10 t

120.65

(ii) more than 10 t but 50 t or less

253.90

(iii) more than 50 t

317.65

Concrete placing boom

120.65

Building maintenance unit

65.95

Service lift

45.70

A lift other than a service lift

79.35 plus 18.30 for each floor

Escalator

61.40

Air-conditioning unit

149.80

Specified amusement device that is classified as:

(i) a class 2 amusement device

120.65

(ii) a class 3 amusement device

184.55

(iii) a class 4 amusement device

253.90

(iv) a class 5 amusement device

253.90

If a boiler is heated electrically, the fee payable must be worked out on the basis that 1 kW equals 0.08 m2 of heating surface.